- providing hand sanitising stations around site, including the entrance/exit
- providing COVID-19 induction training to all personnel
- displaying signs on hand hygiene and social distancing
- reducing seating in offices and canteens to maintain social distancing
- enhanced documented cleaning regimes where commonly touched surfaces are cleaned throughout the day
- meetings to be held outside where possible
- external signing-in booths created so contractors don’t need to go into the office
- staggered breaks to reduce the number of people using the canteen
- people limits placed on all communal rooms to maintain distancing
- one-way system implemented around site for pedestrians to prevent people crossing
- where queues might occur, such as to use toilets, the floor has been marked with 2m spacing
- all contractors to amend their Risk Assessment Method Statements (RAMS) to include COVID-19 control measures, ensuring social distancing is maintained when completing tasks
- Before restarting work all site personnel are provided with specific COVID-19 induction training covering the site-specific requirements
12th June 2020
This week the Government has had to drop its plan to send all primary age children back to school before the start of the summer holidays.
After weeks of warnings from the teaching profession the Department for Education has reluctantly had to conclude that most school premises in England simply aren’t big enough to allow all children to return while maintaining safe social distancing.
But our modular classrooms are a fast and cost-effective way to expand school capacity and allow more children to return to education. Headteachers looking for novel ways to re-open safely should consider hiring or buying modular classrooms from Rollalong as a temporary solution.
Other options are being explored, such as using space in council buildings, libraries or theatres. But the fact remains that schools will find it easier to re-open if all pupils are taught on the same school site. Modular classrooms that can be quickly and easily installed are an obvious answer.
We have a number of modular double classrooms for purchase or hire which we can install and fully fit out in between four and eight weeks depending on the site and the groundworks required.
The classrooms can also be adapted for other uses such as extra offices or storage space.
The standard 18218mm x 9318mm double classrooms with toilets are fully BB101 compliant with 2019 regulations, and electrics, plumbing and groundworks can be completed our team as part of the hire or purchase.
We can deliver the classroom modules anywhere in the south of England – over to London and the South East and as far north as Oxford.
There’s no minimum or maximum hire period, but hiring becomes more cost-effective the longer you want to keep your new building.
The ground conditions on your site and the proximity to other buildings and services will influence our ability to install our classroom modules.
To find our more and enquire about prices please email our sales estimator Joe Pilgrim:
joseph.pilgrim@rollalong.co.uk
The standard specification of these classrooms includes the following:
2 x classroom
2 x pupil WC
1 x accessible WC
Air source heat pumps (energy efficient heating)
Containment for IT provision
2 x store room
uPVC window
Fire doors
Non-slip exterior flooring
Anti-trap ginger guards on all doors
2x storage and sink area
Clad in pale green Hemsec external cladding
- providing hand sanitising stations around site
- providing COVID-19 induction training to all personnel
- displaying signs on hand hygiene and social distancing
- reducing seating in offices and canteens to maintain social distancing
- enhanced cleaning regimes for commonly touched surfaces
- meetings to be held outside where possible
- staggered breaks to reduce the number of people using the canteen
- one-way system for pedestrians to prevent people crossing
29th May 2020
A former defence medical rehabilitation centre in Surrey featuring four major buildings constructed by Rollalong has been converted into an NHS hospital to treat patients recovering from coronavirus.
NHS Seacole Centre near Leatherhead, the first UK hospital dedicated to helping coronavirus patients recover from the long-term effects of the illness, has accepted accepted its first patients this week.
The Jubilee Rehabilitation Complex was the last phase completed at the former DMRC Headley Court in Surrey by Rollalong in 2012. The new facility was officially opened that year by TRH the Prince of Wales and the Duchess of Cornwall.
Headley Court was mothballed in 2018 but has now re-opened as NHS Seacole Centre, with space for up to 300 beds if they are needed.
It was opened on 4th May by the Health Secretary Matt Hancock and is named after pioneering nurse Mary Seacole who set up the British Hotel behind the front lines of the Crimean War to help sick and injured soldiers recover.
By honouring the British-Jamaican nurse, the hospital’s name also serves as a tribute to BAME (black and minority ethnic) NHS staff who are working on the frontline of the UK’s fight against the virus.
NHS Seacole Centre is a community hospital and the first of its kind in the UK, designed to provide space for patients to recover after coronavirus treatment, as well as those who’ve been in hospital for routine treatment.
It allows patients to be discharged from acute hospitals to free up space and is run by Epsom and St Helier University Hospitals NHS Trust.
The £11m Jubilee Rehabilitation Complex built by Rollalong featured a 48-bed ward accommodation building, therapy block and workshop. It was constructed in nine months to provide clinical and rehabilitation facilities for amputees, mostly from the military, with single, double or triple prosthetics.
“Despite the exacting timeframe, we were able to rise to the challenge thanks to our quality-driven approach and our strong existing relationship with the MoD,” said Rollalong Managing Director Steve Chivers.
“Although we haven’t been involved in the conversion of Headley Court to an NHS COVID-19 hospital, it’s gratifying for us to see our buildings put to important new uses. It just shows how adaptable and flexible modular buildings can be.”
26th March 2020
With regret, we are today announcing the temporary closure of our factory and head office in Dorset for the next three weeks owing to the Coronavirus (COVID-19) pandemic.
The health and safety of our employees and the wider community is our primary concern and the Prime Minister’s instruction earlier this week means we can no longer safely ask our staff to come in to work.
We will remain closed until such time as the Government’s advice changes.
All 100 of our permanent staff will continue to be employed by Rollalong Ltd.
If you are one of our valued customers and would like to message us please email me at steve.chivers@rollalong.co.uk
Many thanks for your understanding.
Steve Chivers
Managing Director
- RIDDOR: 133 per 100,000 workers (2.75 times better than industry average)
- Average days lost per worker: 0.04 (4.25 times better than industry average)