New Report Shows Benefits of Modern Methods of Construction

[et_pb_section fb_built=”1″ admin_label=”section” _builder_version=”4.16″ global_colors_info=”{}”][et_pb_row admin_label=”row” _builder_version=”4.16″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” global_colors_info=”{}”][et_pb_column type=”4_4″ _builder_version=”4.16″ custom_padding=”|||” global_colors_info=”{}” custom_padding__hover=”|||”][et_pb_text admin_label=”Text” _builder_version=”4.16″ background_size=”initial” background_position=”top_left” background_repeat=”repeat” global_colors_info=”{}”] Fewer defects, lower whole-life costs and increased customer satisfaction are just some of the benefits of modern methods of construction (MMC). Those are the key findings in a new report published today (11th June 2024) on the outcomes of an innovative trial to demonstrate how MMC can help tackle the affordable housing shortage in the UK. Rollalong’s partner Magna Housing commissioned asset management specialists CAMS to produce the proof of concept report. Magna adopted an award-winning ‘MMC-first’ business case in 2020, setting out to prove that offsite construction could deliver ‘an ordinary home’. Last year Magna completed its proof-of-concept phase of creating the first 50 factory-built homes in partnership with Rollalong. The new report highlights evidence of the benefits of Magna’s approach in overcoming challenges to MMC, which include:
  • Fewer defects compared to traditionally built homes, saving money and time.
  • Overcoming planning barriers, creating homes that complement local environments.
  • Increasing customers’ satisfaction with new homes.
  • The ability to deliver modular homes from the factory to sites via narrow, rural roads.
  • Securing industry standard National House Building Council’s (NHBC) Accepts warranty.
  • Lower costs, including maintenance, over the whole life of homes.
  • Showing that customers are able to secure a mortgage on MMC homes when sold.
Magna looked to MMC to address what it saw as the performance gap between the design standard and final product of traditionally built homes. This was leading to additional costs and delays once homes were built, causing dissatisfaction for customers. Magna partnered with Rollalong to deliver its proof of concept and has since formed a procurement cluster including Wiltshire Council to secure value for money. Rollalong’s Sales Director Paul Jones said: “What we’ve created in this proof-of-concept phase is a regional exemplar, a scalable model that can be replicated up and down the country to help solve the housing crisis. “This report puts an open and honest assessment out to the market following the delivery of the first five sites with Magna Housing, specifically looking just at the superstructure only. These modular housing developments have gone extremely well but like all concepts and new partnerships, we had overcome some challenges along the way, and we want to articulate those challenges in this report. “Since the last project, which was delivered in 2023, we have fed all lessons learned into our latest house design and manufacturing processes and we are proud to now have a solution which can deliver homes more quickly, more cheaply and to a higher standard than traditional housing projects. “We’ve had fantastic feedback from customers and Magna Housing are delighted with the quality of the homes.” “Now well out of the proof-of-concept stage, we are pleased to be continuing to manufacture house types in our Dorset factory,” Paul added. “Let’s break the paradigm of modular house building being difficult and requiring huge quantities – we are currently running house types in batch quantities as small as two for our customers. Get in touch at with Abi at  enquiries@rollalong.co.uk for a price and solution that suits you.” Watch our video explainer below, and scroll down to download the full Proof of Concept Report.[/et_pb_text][/et_pb_column][/et_pb_row][/et_pb_section]

Last week we transported 30 modules from our factory in Dorset to Corsley in Wiltshire where we’re working on a development of eight new homes for Wiltshire Council. 

The modules were manufactured at our facility near Bournemouth and they will make up six houses and two accessible bungalows on Maud Davies Close in Corsley Heath, a small village between Warminster and Frome in Wiltshire. 

Transportation and installation of the modules took just five days, reducing congestion and disruption for local residents in the village. 

Five of the homes will be offered for social rent and the other three will be available for shared ownership, increasing the number of affordable homes for people in the area.

The homes are built to 100% NDSS (Nationally Described Space Standard), will be net zero in operation, and will have all-electric boilers with air source heat pumps.  

To encourage environmental diversity and sustainability, bat and bird boxes will be installed on every house, and EV chargers will encourage the use of electric vehicles. 

The façades of the houses will be a blend of render and brick-slips in a distinctive banding pattern to reference the Victorian Red Cottages close to the site.

 We’ve installed the first modular home provided by Wiltshire Council on a site in Durrington.

The two-bedroom accessible bungalow on New Road in Durrington is the first to be commissioned by the council using Modern Methods of Construction, or MMC. Wiltshire Council is delivering more than 150 such homes across the county. Factory construction means they are quality checked, highly insulated and draught free, and residents will be able to move in soon – the properties arrive decorated and already fitted out with kitchens and bathrooms. “It’s really rewarding for everyone involved in the project to see this modular building take shape on on site,” said Councillor Phil Alford, Cabinet Member for Housing at Wiltshire Council. “The team from Rollalong are experts at manoeuvring the units precisely into place and the bungalow will be ready for occupation in a fraction of the time on site that it would take in a conventionally built home. “We are adapting to the demand for more sustainable and efficient methods of construction and adopting this growing technology to deliver around 150 new homes across the country. “With their brick slips, render and roof tiles, it’s hard to tell our MMC homes from traditional builds. “The quality of the building is really impressive – inspectors from the National House Building Council have monitored every step of the process. I’m looking forward to rolling out this technology to more sites across the county and to see our house-building continue to make progress in such an innovative way.” These modular homes are zero carbon in use thanks to air source heat pumps, smart controls, and solar panels. The modules can be configured as bungalows, flats, or houses to suit residents’ needs. Last year Magna Housing and Wiltshire Council joined forces to address the housing crisis, appointing us via the South West Procurement Alliance (SWPA) Offsite Construction of New Homes framework to build nearly 1,000 new homes over the next three years. “We were delighted to be awarded the contract by Magna Housing and Wiltshire Council to design and build these modular homes that will provide a range of high-quality, affordable housing for everyone,” said our Managing Director Steve Chivers. “We are building the homes of the future designed for living today. We want to demystify modular housing and champion the benefits that this style of housing can provide in the face of a nationwide housing crisis. “We are now creating jobs and apprenticeships in the South West, using local supply chain partners, and creating systemic change in our transition towards a circular economy in the region.” The Durrington development is just the latest stage in a roll-out of new modular homes by Rollalong and our partners across the South West. We have already manufactured 120 homes and completed the first five sites in Sherborne, Halstock and Dorchester in Dorset for Magna Housing.

The modular construction sector may be going through turbulent times, but our business is going from strength to strength, writes Rollalong MD Steve Chivers.

We are the largest permanent offsite construction company in the south of England and we’ve built our reputation in the defence, education and healthcare sectors.

We’re now also winning significant residential contracts to provide modular homes for local authorities and housing associations.

In fact, we’re bucking the trend of some recent high-profile failures in the modular offsite construction sector.

Thanks to our many years of experience, our diverse product range and our long-standing partnerships, Rollalong is not facing the same challenges that others are experiencing in the industry.

We have a strong pipeline of work, such as the homes recently ordered by partners Magna Housing and Wilshire Council.  With these houses now being produced in the factory, our business is continuing as normal.

Founded in 1932, Rollalong has been in business for over 90 years and specialises in the design, manufacture and installation of permanent offsite buildings. We currently have 1,000 homes on our order books and five proof-of-concept sites complete.

Unlike other offsite manufacturers, Rollalong does not operate solely in the residential sector – we also have a strong pipeline of work in defence, education and healthcare.

Thanks to our location and long history we also benefit from a robust supply chain, and through our current business model we procure factory materials locally wherever possible.

The residential sector is increasingly important to us, and we have demonstrated the value of collaboration through our partnership with Magna Housing, Wiltshire Council and the South West Procurement Alliance.

Working together, we can deliver the volumes that we require using a market-tested, BOPAS and NHBC Accepts accredited portfolio of standard house types in any step and stagger configuration and rollout through a regional delivery model.

These are exciting times as we roll out the delivery of almost 1,000 new net zero carbon ready and net zero carbon living modular homes across Somerset, Wiltshire and Dorset, using offsite manufactured, precision-engineered techniques to modernise and speed up the whole process.

We were pleased to welcome four visitors from Wiltshire Council to our factory on Tuesday.

Mike Dawson (Head of Estates and Development), Mike Kalvis (Senior Contracts Surveyor from the Asset Management Team) and Councillors Tony Jackson (a member of the Climate Emergency Task Group) and Sarah Gibson had a tour of the factory and visited our show home.

As a member of the Environment Scrutiny Committee, Councillor Jackson is interested in lower carbon activity, and topics for discussion were grey water recycling, rainwater harvesting and ground source heat exchange. Rollalong is part of a partnership with Wiltshire Council, Magna Housing and the South West Procurement Alliance which will build nearly 1,000 new homes in the South West over the next three years.

We’re delighted to report that we’ve completed 15 new affordable modular homes on McCreery Road in Sherborne, Dorset and handed them over to Magna Housing.

We manufactured the homes in our factory near Bournemouth and installed them on the site, where all preparation up to ground floor level, highway construction, drainage and landscaping was carried out by the main contractor Fisher & Dean.

McCreery Road is the third site we have completed as part of a partnership with Magna Housing, Wiltshire Council, the South West Procurement Alliance (SWPA) and consultants Taylor Lewis to deliver almost 1,000 new homes in the South West.

The new affordable homes stand on a former garage site a short drive from a similar Rollalong development of three new modular homes at Barton Gardens in Sherborne.

The development will be called St Aldhelm’s Place after St Aldhelm, the first Bishop of Sherborne, for whom an abbey was founded by King Ine in the eighth century.

Delivery of these new homes supports the local economy by employing local people and using local suppliers.

Environmental and biodiversity features include nesting habitats and habitat creation, one bird and bat box for every two homes, two bee and bug bricks for every home, hedgehog holes at the base of garden fences, and a wildflower meadow sown along the boundary with the allotments.

We were very pleased to welcome a delegation from Wiltshire Council for a visit to our factory last week.

Seven colleagues from the council’s housing and climate change teams, alongside three members of the Wiltshire Climate Alliance, had a tour of our facility in Dorset to see how modular homes are manufactured offsite. 

They were also keen to talk to us about our carbon reduction road map and how we are reducing the carbon footprint of both our operations and the buildings we manufacture. 

We are part of a partnership with Wiltshire Council, Magna Housing and the South West Procurement Alliance (SWPA) which will build nearly 1,000 new homes in the South West over the next three years.  

“Our latest range of homes are net zero carbon ready and net zero carbon living, supporting the Government’s objective of delivering net zero carbon homes by 2050,” said Steve Chivers, Managing Director of Rollalong. 

“We were delighted to have an opportunity to showcase these homes to our visitors from Wiltshire Council, whose mission is to deliver high-quality, attractive homes that provide residents with affordable housing and lower energy bills.” 

28th May 2021

We’re pleased to announce that we will be delivering 19 modular dwellings as part of a pilot scheme for Wiltshire Council.

The new homes will be installed in three different locations across Wiltshire and five of them will be wheelchair-accessible bungalows.

Wiltshire Council is investing in modern methods of construction, or MMC, in particular because of the sustainability benefits which this technique can offer.

The homes will provide much-needed affordable housing for people in Wiltshire and will be built to The Future Homes Standard using advanced technology to achieve a low carbon footprint.

We are working with consultants Taylor Lewis and One50studio and the project will soon be submitted for planning consent.

The South West Procurement Alliance (SWPA) was the procurement route for the project through its Offsite Construction of New Homes (NH2) framework.

We look forward to delivering this exciting pilot scheme and to creating more affordable homes for people in Wiltshire in the future!